CENTRAL 5 SCHOOL

This project incorporates a complete rethinking of an existing fragmented school design, of which there is a 1910 component and a 1930’s component. After evaluation, the projectteam decided to save and renovate the 1930’s component, while demolishing the 1910 component and replacing it with a new addition.

 

 

 

 

 

 

  • http://potterarchitects.com/wp-content/uploads/2013/04/1-Featured-Image1.jpg
    FEATURE
  • http://potterarchitects.com/wp-content/uploads/2013/04/1.5-3D-Rendering.jpg
    3D RENDERING
  • http://potterarchitects.com/wp-content/uploads/2013/04/2-Under-Const..jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/3-Under-Const..jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/5-Construction.jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/6-Construction.jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/7-Construction.jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/8-Construction.jpg
    CONST.
  • http://potterarchitects.com/wp-content/uploads/2013/04/Latest.jpg
    LATEST